Project Overview
Team Builders restored two failing exterior staircases and rebuilt three commercial-use balconies affected by corrosion and metal fatigue.
We fabricated new steel structures, applied anti-rust treatments, and installed reinforced railing systems engineered for high foot traffic.
Extreme winter conditions required heated working enclosures and strict safety procedures to prevent metal contraction issues.
Demolition of existing metalworks
Structural steel fabrication
Anti-corrosion treatment
Railing and step installation
Winter-operation safety controls
The new structures passed all code inspections, ensured tenant safety, and extended usable lifespan by over 30 years.